Caltrans PS&E · Drafting QC Backstop

Every sheet,
checked against every rule.

A systematic QC backstop for Caltrans plan sets. 615 rules drawn straight from the PPM and CADD Manual, applied uniformly to every sheet in every plan set you ship.

Built and validated by working California civil engineers. Stratum Check doesn't stamp plans, doesn't approve designs, and doesn't sign off on submittals. It catches what manual review can miss under deadline pressure — so the issues that reach your engineer are the ones that actually need their judgment.
14-day trial · no credit card required.
app.stratumcheck.com/reviews/SC-2026-0421-A
SHEET TS-03 · TYPICAL SECTION RUNNING
3 findings on this sheet
SHALL
Postmile missing from title block PPM § 3.2 · TBR-014
SHOULD
Sheet index placement below title block PPM § 2.4 · TBR-008
MAY
Line weight for existing utilities CADD Manual § 4.3 · LWT-002
RUN SC-2026-0421-A · 41 OF 72 SHEETS CHECKED
Drawn directly from Caltrans published standards
Live

PPM

Plans Preparation Manual — title blocks, sheet layout, annotations, submittal requirements.

Live

CADD Manual

Line weights, symbology, layer conventions, and plot-visible drawing standards.

Design Review tier

HDM

Highway Design Manual — alignment, sight distance, pavement, structures. Premium tier, in development.

Bid Package tier

Plans + Specs

Cross-reference QA between the plan set and Caltrans standard special provisions.

Caltrans first because no other state DOT has drafting standards this rigorously codified. Other transportation agencies are on the roadmap as the framework generalizes.

How it works

From plan set to reviewer-ready findings.

Three passes across every sheet — text, geometry, and vision — applied to every rule that fits.

01

Upload your PS&E

Drop the full plan set PDF. Stratum Check extracts text and rasterizes every sheet at the resolution the engine needs.

02

Sheets are identified

Title, typical section, layout, profile — each sheet is classified from its title block and filename so rules apply where they belong.

03

615 rules run

Text extraction, geometric verification, vision checks — applied systematically across every rule that fits each sheet type.

04

Findings to your engineer

Your reviewer confirms, defers, or dismisses each finding with a single click. Citations included. Engineer keeps the call.

Why firms run Stratum Check

Fewer things slip through the cracks.

The findings that reach Caltrans submittal review are the ones a manual QC pass missed under deadline pressure. We've spent careers watching those misses cost firms time, money, and professional standing.

Systematic rule coverage

Every rule runs on every relevant sheet, every time. No reviewer variance, no rules skipped because the deadline was tight, no human fatigue on the 70th sheet.

Reduced submittal risk

Fewer findings caught by Caltrans at submittal means fewer plan revisions, fewer re-stamps, less rework cost, less professional exposure.

Citations, not opinions

Every finding references the exact PPM or CADD Manual section it came from. Your reviewer sees the rule text — no black-box judgment.

Engineer-built, engineer-tested
Stratum Check exists because we've spent fifteen-plus years delivering Caltrans PS&E ourselves — and watched, again and again, how the systematic checks slip when deadlines compress and reviewer attention runs out.
The Stratum Check team
By the numbers

Built on real plan sets, validated by real engineers.

0
Rules in the engine
0
Sheet types classified
0+
Years engineering experience
$0M+
Construction value delivered
The long view

A QC backstop that teaches.

Running plan sets through Stratum Check produces more than findings. Over time, a feedback loop forms — junior staff learn the standards in context, and senior engineers spend their reviews on the calls that actually require a stamp.

For junior engineers

Every finding cites the exact PPM or CADD section it came from, with context explaining when the rule applies and why. Running their own plan sets through Stratum Check, junior staff pick up the standards in real situations — faster and more durable than reading the manual cover-to-cover, and more reliable than catching things ad-hoc under deadline.

For senior engineers

The systematic checklist pass happens before your senior reviewer opens the plan set. Their attention stays on ambiguous calls, design trade-offs, and the handful of findings that actually need a licensed decision — not on hunting for the 40th missed postmile annotation of the day. Senior engineer time stays on senior engineer work.

See what it catches on your next plan set.

14 days. Up to 5 reviews during the trial. No credit card required.

Request beta access